ArborBLU Tops Out in Ann Arbor

| Blog Post

12 months, 13 stories and 620 tons of steel: details about the topping out.

After almost 12 months, ArborBLU, our student housing development near the University of Michigan, recently topped out. Marking 13 stories, this construction milestone includes 1600 precast concrete planks in the floors and 620 tons of steel forming the structure of the building. The existing Pizza House restaurant takes up half of the lower two levels.

The building will open for students before the start of the fall 2015 semester.

Share this article

X logo X logo LinkedIn logo Facebook logo

Article Type: Blog Post