Opus Time Lapse: Climate by Design International Completion

| Video

Climate by Design International’s new facility allowed them to bring all operations and employees into a single facility, streamlining production and distribution, strengthening their corporate culture and supporting growth into new markets.

Climate by Design International (CDI) chose our team to develop and construct a 203,760-square-foot headquarters and production facility in Owatonna, Minnesota. The building allowed CDI to bring all its operations and employees into a single facility, streamlining production and distribution while strengthening its corporate culture and supporting growth into new markets.

The building includes a two-story office with abundant glass to draw in natural light and manufacturing and distribution space. The design includes a wide range of amenities to help retain and attract the company's growing workforce. It features:

  • four dock doors
  • 221 vehicle parking stalls
  • two large training rooms
  • catering kitchen and large two-story cafeteria with floor-to-ceiling windows
  • outdoor patio and walking path around the 14-acre property
  • air conditioning throughout the building, including the manufacturing area
  • fitness room with lockers and showers
  • prayer room
  • bike room

Project Type: industrial
Size: 203,760-square-foot
Completion: October 2023
Location: Owatonna, Minnesota

Services Provided: development, design-build and architect and structural engineer of record

Watch construction fly by in under 30 seconds!

Share this article

X logo X logo LinkedIn logo Facebook logo

Article Type: Video

Topics: Des Moines | Industrial Development & Construction | Construction | Development