Opus Time Lapse: Climate by Design International Completion
Climate by Design International’s new facility allowed them to bring all operations and employees into a single facility, streamlining production and distribution, strengthening their corporate culture and supporting growth into new markets.
Climate by Design International (CDI) chose our team to develop and construct a 203,760-square-foot headquarters and production facility in Owatonna, Minnesota. The building allowed CDI to bring all its operations and employees into a single facility, streamlining production and distribution while strengthening its corporate culture and supporting growth into new markets.
The building includes a two-story office with abundant glass to draw in natural light and manufacturing and distribution space. The design includes a wide range of amenities to help retain and attract the company's growing workforce. It features:
- four dock doors
- 221 vehicle parking stalls
- two large training rooms
- catering kitchen and large two-story cafeteria with floor-to-ceiling windows
- outdoor patio and walking path around the 14-acre property
- air conditioning throughout the building, including the manufacturing area
- fitness room with lockers and showers
- prayer room
- bike room
Project Type: industrial
Size: 203,760-square-foot
Completion: October 2023
Location: Owatonna, Minnesota
Services Provided: development, design-build and architect and structural engineer of record
Article Type: Video
Topics: Des Moines | Industrial Development & Construction | Construction | Development